Compare the plan before you commit
Explore proposed work alongside existing jobs and project tasks. Move or resize scenario timelines, review dependencies, and compare cash, crew capacity, materials, and contribution against a baseline.
Planning & decisions
Can the team take on another job? What if a payment arrives late? Connect the work, the people, and the cash in a scenario you can inspect before making the call.
Part of Atlas-Beren Workspace · $99/month · 10 full users. Early-access scope and workspace readiness confirmed before billing.Try the connected Console demo
Ask AI about the shared studio job, compare cash and crew, and save a sample watch. Follow source changes into delivery and billing without losing your scenario.
One customer. Shared records.
Explore a smaller version of the Console using scripted AI examples and a fictional October 2026 business. Planning, delivery, and billing share these records across both demo pages. Changes stay in this browser until you reset or refresh.
Guided walkthrough · At your own pace
Ask AI → Planning → Delivery → Billing → Plan changes → Service renewal. Follow the studio lighting job through payment, check what changed in its saved plan, then renew the same customer’s service agreement.
Uses the sample records already on this page. You review and confirm each change in its workflow. Reset sample business starts everything over.
Ask AI · Sample prompts
Choose a scripted example. The response uses this demo’s current records; it is not generated by a live model.
Cedar House Studio
SAMPLE-PROJECT-1042
Proposed studio lighting job
Try the first prompt to inspect the blockers. Then prepare a follow-up and see it appear beside the delivery record after your review.
Use fictional details only in the editable example.Same customer · Same job · Current records
Planning reads these records. Trying a scenario does not accept the quote, amend payment terms, reserve crew, or complete the job.
Cedar House Studio · SAMPLE-PLAN-1042
The shared $2,400 job. An $800 cash reserve to protect. Try timing, payment, and crew assumptions against the same delivery and billing records.
Each option uses the same current source records. Choose one, then adjust its assumptions. Extra crew means additional cost as well as capacity.
Selected: Start as planned
Compared with the original plan using these same sources: $0 at the lowest cash point, 0 hours of change in uncovered crew time, and $0 in contribution.
Deposits change when cash arrives. Extra crew costs $75 per hour, paid in the first working week. These are assumptions to review, not customer consent or a crew booking.
Start as planned · Current sample sources
Available hours are after existing commitments, plus any assumed extra crew. The open job requires four hours in each of two modeled weeks. Recorded completion clears the remaining crew demand.
2h uncoveredBaseline: 2h
0h uncoveredBaseline: 0h
0h uncoveredBaseline: 0h
0h uncoveredBaseline: 0h
0h uncoveredBaseline: 0h
0h uncoveredBaseline: 0h
Opening cash: $2,000, including $0 of reviewed job receipts added to the $2,000 sample balance. Other business receipts: $800 in week 2 and $1,200 in week 4. Existing outflows: $600 each week.
The job models $600 of materials and $150 of labor in each working week. Extra crew adds $0. Job costs remain in the cash model after completion because completion alone is not evidence that costs were paid. These costs are included once, separately from existing outflows.
The proposed 0% deposit applies to the $2,400 still unpaid, arriving in week 1; the balance arrives in week 3. Base capacity is 2, 6, 8, 8, 8, and 8 hours, with 0 hypothetical extra hours in the first working week. These relative weeks illustrate timing; they do not replace agreed dates. Taxes, overhead, daily cash timing, and unrecorded costs are excluded.
| Week | Opening | Existing receipts | Job receipts | Existing outflows | Job costs | Closing | Crew needed | Crew available | Uncovered |
|---|---|---|---|---|---|---|---|---|---|
| 1 | $2,000 | $0 | $0 | $600 | $750 | $650 | 4h | 2h | 2h |
| 2 | $650 | $800 | $0 | $600 | $150 | $700 | 4h | 6h | 0h |
| 3 | $700 | $0 | $2,400 | $600 | $0 | $2,500 | 0h | 8h | 0h |
| 4 | $2,500 | $1,200 | $0 | $600 | $0 | $3,100 | 0h | 8h | 0h |
| 5 | $3,100 | $0 | $0 | $600 | $0 | $2,500 | 0h | 8h | 0h |
| 6 | $2,500 | $0 | $0 | $600 | $0 | $1,900 | 0h | 8h | 0h |
Monitored plans · Manual simulation
Save a scenario and its source snapshot, simulate new evidence, then run a check. This example stores one watch in memory and runs no background checks or notifications.
Scenario to watch: Start as planned · Start week 1 · 0% deposit · 0 extra crew hours
Changes in crew availability, quote acceptance, receiving, or completion need review. Thresholds apply to source changes; they do not certify the forecast or its cash reserve.
Crew capacity, material cost, quote acceptance, receiving, completion, and billing feed this watch. Change the sample evidence in its workflow, then return here to check it.
Simplified weekly illustration calculated in this browser. The Console uses a broader daily model with authorized records and reviewed assumptions. Refreshing or resetting clears this demo and its watch.
Customer → Quote → Project → Delivery
Cedar House Studio · Studio lighting upgrade. Review the quote and confirm the actual material receipt before completing the sample job.
SAMPLE-EST-1042
Simulate the customer’s approval of this exact sample scope and price.
SAMPLE-PO-1042
Prairie Lighting Supply · Six fixtures required. Four are already received at the start of this example.
Only a confirmed receipt changes the sample stock count. No real inventory is affected.
SAMPLE-TASK-1042
No task yet. Ask AI can prepare one; you choose the owner and date before saving.
SAMPLE-JOB-1042
Jordan Lee · October 8, 2026
The estimate still needs customer acceptance. 2 of 6 fixtures still need to be received.
This reduced example checks quote acceptance and material receipt. Live dispatch also considers skills, availability, and other recorded constraints.
SAMPLE-CREW-W2 · SAMPLE-MATERIAL-BILL
Adjust fictional availability or the material bill, then compare the impact on the shared job. A supplier report does not clear its receiving blocker.
Completed work → Invoice → Receipt → Profit
Cedar House Studio · SAMPLE-JOB-1042 · SAMPLE-INV-1042. A receipt reduces the balance; it does not add invoice revenue again.
The PDF is a fixed unpaid specimen; it does not change with the demo. Sample only—do not pay.
Issue the sample invoice first. A statement that the customer paid does not create a receipt.
Revenue less entered labor and parts. Unrecorded overhead and other missing costs are excluded. This is not a general ledger or bank reconciliation.
SAMPLE-RECEIVABLE-08 · SAMPLE-INV-1042
Reviewed studio receipts add to modeled opening cash and reduce the unpaid job receipts. Invoice revenue and recorded profit stay unchanged. The other business receivable below affects the same cash forecast.
Planning assumptions do not rewrite the quote, invoice, recorded costs, or customer payment terms.
Office offer → Customer acceptance → Office review
A separate sample service agreement for Cedar House Studio. The current term ends October 31, 2026. Sharing, customer acceptance, and creating the next term are separate actions.
SAMPLE-RENEWAL-1042
The terms stay fixed throughout this example. Changed live terms require a new reviewed offer.
Simulated customer portal
The office has not shared an offer yet. Customer acceptance becomes available after sharing.
No real customer account is used, and accepting the offer does not authorize payment collection.
Office review
The real workflow rechecks current sources, permissions, and competing renewals. These fictional checks illustrate the review sequence.
Review history
Questions and drafts do not create activity. Confirmed sample changes appear here with a link to the affected workflow.
Scripted responses, fictional evidence, and browser-only state. No live AI, messages, stock movements, bookings, payment collection, or accounting sync. Live Console access and supported actions depend on your permissions and workspace setup.
AI access & review ↗Inside the Console
The live Scenario Studio connects authorized Operations, Projects, and Financial records with the assumptions you review. These capabilities go beyond the simplified public example above.
Explore proposed work alongside existing jobs and project tasks. Move or resize scenario timelines, review dependencies, and compare cash, crew capacity, materials, and contribution against a baseline.
Try a delayed receipt, unavailable crew member, supplier delay, or unexpected job. Review the modeled effect, then compare later dates, deposit terms, or added capacity against your goals.
Start with a customer, job, project, or invoice and follow its recorded connections into the scenario. See the source behind a constraint and return to the record that needs attention.
Save a plan watch with thresholds for the changes that matter. Review source changes and alerts in the workspace, then recalculate with current evidence. A watch does not apply a new schedule for you.
Compare tested combinations of proposed work by contribution, cash exposure, and finish date. Inspect actual recorded waiting periods alongside open queues; missing historical events remain unknown.
Present the current situation, proposed changes, and tradeoffs with timeline playback and a PDF export. Freeze a prediction and compare it with later, evidence-backed actuals recorded by your team.
From a scenario to a decision
In an authorized live workspace, eligible job and task date changes have a separate review-and-apply step. Current source records, dependencies, permissions, and scheduling constraints are checked again before a supported change is saved.
Results depend on recorded work and entered assumptions. Unrecorded overhead, future sales, missing costs, and unknown history are not invented. The work-mix explorer compares tested options; it does not guarantee an optimal schedule or a business outcome.
Moving a scenario bar does not book a crew, reserve stock, send a message, or change accounting. Proposed deposits need customer agreement. Actual-versus-forecast comparisons use reviewed observations and do not establish bank reconciliation.
Read planning and access details